Detection and prevention solve different problems.
A transparent worked example of constraint-based industrial reasoning.
ILLUSTRATIVE ENGINEERING DEMONSTRATION · NOT A CLIENT PROJECT
Reasoning
An illustrative process generates 8% defects with 80% detection. Escapes are 8% × (1 − 80%) = 1.6%. Improving detection to 98% reduces escapes to 0.16% while generation stays at 8%. Reducing generation to 2% with unchanged detection gives 0.4% escapes.
Evidence before a decision
Define defects, sampling, detection effectiveness and upstream conditions.
Potential work products
Evidence plan, causal hypotheses, action owners and effectiveness criteria.
Limits
This is a fixed simplified example, with independent intervention alternatives. It is not a resource-leveled forecast, production measurement or guarantee of improvement.
Try the interactive model →Discuss a related challenge →